Working With a Designer or Specifier on a Slab Table Project

Most of my table calls come from one of two people. One is a homeowner who saw a slab, fell for it, and wants to know whether it fits the room. The other is a designer or a specifier working from a floor plan, with a deadline, an approval chain, and a client who is not standing there. That second conversation runs on a different set of facts. If you specify furniture for a living — residential interiors, architecture, a hospitality group, a corporate furniture package — here is how I work and what I need from you.

The trade page covers the mechanics. What follows is the part that is harder to put on a page.

You are specifying a one-of-one piece

Everything else hangs off this. A live-edge Saman top (Samanea saman, sold as monkeypod) is one continuous piece out of one tree. The slab next to it in the rack came from a different tree and it will not match — not in width, not in color, not in figure. There is no re-order and no second unit.

That changes the order of operations. On a catalog product you present first and procure second. Here, a slab a client is going to see has to be held before you show it, or you need to be ready to tell them the honest version: this one is available today and may not be next month. Designers who have run one of these projects tend to hold early.

What I need from you early

Not much, but I need it before I start pulling candidates rather than after. The finished dimensions you are targeting, and what tolerance the room will actually accept — a slab that has to be exactly one width is a much harder search than a slab that can land in a range. The room dimensions and how much space you want behind pulled-out chairs. Your seat count. The base direction: steel or wood, what height, what style, and whether it is being fabricated locally. Who approves, and in what order. And two dates, not one — the date the piece has to be in the room, and the date the room is actually ready to receive it. Those are rarely the same date, and the gap matters more than people expect.

How holds work

I hold a slab against a named project for an agreed window, and we settle terms in writing before the hold starts. While it is held it comes off the table for anyone else, and if someone asks about it I tell you. When the window is running out I call you — I do not let a hold lapse quietly and then sell the slab out from under a project you are still working.

What I ask in return is honesty about the state of the approval. A hold on a project that died weeks ago costs me real business and costs you nothing, and it is the one thing that makes me cautious about the next one.

Photos, visits and client expectations

Every listing carries its own photos and its own dimensions. If you need to see something the photos do not cover — an end grain edge, a fill from a particular angle, how the color reads under different light — ask and I will take what you need. Better still, come stand in front of it, with the client if you can. A slab is a physical object and photographs flatten it.

The conversation worth having before the client ever sees it is the one about character. A single-slab top carries bark inclusions, voids, checks and fills, and those are the material rather than flaws in it. A client who has been prepared for that reads them as the reason they bought the piece. A client who has not reads the first one they find as damage. Which of those happens is decided by you, in the presentation, before delivery day. Finishes and fills vary from slab to slab here, so each listing states its finish — if you are coordinating a sheen across a room, ask me which one you are looking at.

What belongs in the spec

Three things, and putting them in writing saves everyone a phone call in February.

First, that the top is solid wood and will move seasonally — a measurable change in width between the furnace months and the humid ones, with hairlines at fills that open and close on the same cycle. Second, that the base has to let the top do that: slotted holes or figure-eight fasteners, not screws driven tight through fixed holes. If a local fabricator is building the base, say this to them directly and do not assume they build for solid tops. Third, the dimensions as measured on the actual slab, carried through to the shop drawing. A live edge is not a straight line, so the width at one end is not the width at the other, and a drawing built on a single number will not match what arrives.

Sequencing

On most of these projects the slab is not the long pole. A base being fabricated, a finish decision waiting on an approval, or a site that is not ready sets the real schedule. So I sequence backwards from the date the room is ready, and I would rather hold a finished piece here for a few weeks than deliver into an active construction site. Ask me about storage before you ask me to hurry delivery.

One contact

You deal with me. I answer my own phone, I do the quoting, I coordinate the delivery, and I am the one who shows up if something needs sorting out. For a specifier that is the useful part: one person who knows the slab, the base, the truck and the room.

If you have a project in front of you and want to talk through what is here before you present anything, reach me on the contact page or call directly.

Norman Jimenez
(773) 584-7334
info@platinumluxuryteak.com

Back to blog